Danube River Trip - 2005 - Roeder-Johnson
As the first low bridge approaches, the crew takes a rest, after collapsing canopies, hand rails, a wet bar, and more for this 30-minute trip upriver to our temporary dock for the night.

The Danube was flooding, so we were unable to start this trip upriver in Passau, Germany, and some bridges were temporarily impassible.

As the first low bridge approaches, the crew takes a rest, after collapsing canopies, hand rails, a wet bar, and more for this 30-minute trip upriver to our temporary dock for the night.

The Danube was flooding, so we were unable to start this trip upriver in Passau, Germany, and some bridges were temporarily impassible.